Se Habla Español Español
Mold consulting · Statewide

Mold Assessments, Remediation Protocols & Post-Remediation Verification

TSEC is the independent, TDLR-licensed assessor Texas law requires: we define the problem, write the protocol the remediator follows, and verify the result.

TDLR Mold Assessment Company ACO1193

Texas regulates mold work more tightly than most states. Under the Texas Mold Assessment and Remediation Rules, a licensed mold assessment company must generally write a remediation protocol before a licensed remediation contractor begins work on projects that exceed the 25-contiguous-square-foot threshold, the same company may not both assess and remediate the same project, and a post-remediation assessment is required before the remediator issues the Certificate of Mold Damage Remediation. Certain situations — including a homeowner working in their own residence — are treated differently under the rules. Read more: why your assessor and remediator must be different companies.

Mold assessment and indoor air quality testing

Every assessment begins with the water. Our licensed assessors document visible growth and moisture damage, map moisture with meters and thermal imaging, and identify the source — because remediation without source correction fails. Where sampling is warranted we collect air samples (spore-trap), surface samples (tape lift, swab, or bulk), and comparison outdoor samples, analyzed by an AIHA-LAP-accredited laboratory. For occupant complaints without visible growth we perform indoor air quality investigations covering relative humidity, temperature, carbon dioxide, and ventilation performance — and tell you plainly when the problem is not mold.

Remediation standard operating procedures (SOPs)

The protocol is the document your remediation contractor bids from and the regulator measures against. TSEC's remediation SOPs specify, by area:

  • Extent of material to be removed or cleaned, by location and material
  • Containment class and construction; negative-air pressure differentials and air changes per hour
  • Personal protective equipment and worker decontamination sequence
  • Removal and cleaning methods for each material, and disposal handling
  • Clearance criteria the post-remediation assessment will test against

Protocols are written to the Texas rules and to the IICRC S520 standard so any licensed contractor can execute them without interpretation.

HEPA decontamination protocols

Cleaning is where remediation is won or lost. Our protocols require HEPA-vacuuming of all surfaces within containment, damp-wiping with an appropriate cleaner, a second HEPA pass, and HEPA air scrubbing for a defined period before clearance sampling, with negative air maintained until the post-remediation assessment passes. For occupied or sensitive facilities — healthcare, schools, control rooms, data and communications spaces — protocols add sequencing, after-hours phasing, and equipment protection so operations continue while work proceeds.

Post-remediation verification

TSEC returns after the contractor reports completion for the post-remediation assessment: verification that the protocol scope was completed, that no visible growth or dust remains, that moisture readings in remaining materials are within normal range, and — where the protocol requires it — that air and surface sampling results meet the clearance criteria. Our written post-remediation assessment report is the document the remediator needs to issue the Certificate of Mold Damage Remediation, which Texas requires within 10 days of the passed assessment and which property owners must retain and disclose on sale.

Who this is for

Property managers and multifamily owners; facility managers in occupied buildings; insurance adjusters; real-estate transactions; remediation contractors needing an independent assessor; homeowners after water damage.

Timeline and pricing

Assessment visits typically take one to three hours. Laboratory results, the written report, and the remediation protocol follow within a few business days; rush turnaround available. Written quote the same business day.

Regulatory sources

Requirements vary with building classification, ownership, scope of work, and local permitting. The statements on this page are general; confirm the requirement for your specific project before scheduling work. Primary sources:

Let's talk about your property

Call, email, or send us your project details and a licensed consultant will follow up with scope and scheduling.

Phone Austin / San Antonio: (512) 952-2757
Houston: (832) 982-2757
McAllen / Laredo / RGV: (956) 520-2757
Office2028 E. Ben White Blvd., Ste. 240-2757
Austin, TX 78741
LanguagesEnglish & Spanish

Request a project proposal

Send us the project address, scope, plans, or construction documents and we'll help determine what the environmental requirements are — then price the work.

  • Written proposal back the same business day
  • Scope, schedule, and fee — laboratory analysis included on most surveys
  • English or Spanish, whichever you prefer
Request a Project Proposal

Prefer to talk it through? Call the line for your region — a licensed consultant answers, not a call center.